Equipment BOM Binding
Actual normalized general-material relationships from SAP BOM source.
RU III Plaju · 6301
ITP-N-CP3/00
3 normalized general-material bindings. Equipment-specific/OEM lines remain in the raw SAP BOM source and family-specific evidence views.
| SAP Material | Commodity | Description | Qty | UOM | BOM Lines | Spare Flag |
|---|---|---|---|---|---|---|
| H780902797 | PIPE / TUBE | TUBE,FIN ASSY,TUBE,FIN ASSY | 1 | PCS | 1 | O |
| I090910647 | BOLT / STUD / NUT | BOLT & NUT, BOLT & NUT | 1 | PCS | 1 | R |
| J200911625 | GASKET | GASKET,SW,18-8,S.S DWG.EPK-2002-103,REV.2,PN.117-1 | 1 | PCS | 1 | R |