Portal›Maintenance Plan

Maintenance Plan Engineering

Converts approved task logic into scheduling / trigger rules and lean SAP execution. Not every maintenance activity requires a cyclic work order.

Registered Plans - Assets
36.036
16.0% coverage
Plan Engineering Rows
314
One per maintenance task
SAP Plan Patterns
8
PA-01 through PA-08 plan patterns
Actual Call-Detail Assets
19.574
Matched from RU Sheet2

SAP Plan Patterns

CodePlan PatternUse CaseCall ObjectRoutine Plan?Default GroupingTask Rows
PA-01Monitoring / No Routine SAP PlanContinuous/online monitoring; exception-driven actionNoneNoSystem/area monitoring route37
PA-02Inspection / Routine NotificationSimple inspection / due-date / condition routeNotificationYesRoute/circuit/area/due window120
PA-03Test / Calibration NotificationSimple test/calibration/provingNotificationYesUnit + discipline + method + due window12
PA-04Campaign / Package WORepetitive work needing resources / permit / vendorPackage WOYesArea/unit + discipline/vendor + common window76
PA-05Individual Planned WOUnique asset-specific scheduled workIndividual WOYesEquipment-specific0
PA-06TA / Shutdown PackageIntrusive work requiring outage/TAPackage WOConditionalTA/unit/system/work package14
PA-07Condition-Triggered WORepair/restoration from finding/diagnosticIndividual WONo routine cyclic planFinding/equipment/defect54
PA-08RTF / CorrectiveApproved failure-event workflowCorrective Notification / WONo preventive planEquipment/failure event1
Maintenance Plan Engineering Library - Task ID deep-links back to the Task List.314 rows
Task IDFamilyTask TitleFinal Frequency / Trigger RuleOwnerPlan PatternSAP Plan TypeCall ObjectRoutine?
ST-BOILER-PM-01BoilerBoiler Burner / Soot / Draft Equipment Preventive ServiceAnnual formal review + condition-triggered action.Reliability + Maintenance DisciplinePA-04 CAMPAIGN / PACKAGE WOStrategy / single-cycle / counter campaign planPackage WOYes
ST-BOILER-OVH-01BoilerBoiler Condition-Triggered Tube / Refractory / Burner RepairCondition trigger; use TA opportunity where technically justified.Reliability + Maintenance / OEMPA-06 TA / SHUTDOWN PACKAGETA / shutdown due-date control / packagePackage WOConditional
ST-PSV-INS-01Pressure Safety / Relief ValvePSV / PRV External In-Service InspectionRisk-based periodic interval; document technical basis.Inspection / Asset IntegrityPA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-PSV-FT-01Pressure Safety / Relief ValvePSV Bench Test / Set Pressure / Seat Tightness TestRegulatory / risk / history due — final cycle to be approved by interval owner.Reliability + Process Safety + DisciplinePA-04 CAMPAIGN / PACKAGE WOStrategy / single-cycle / counter campaign planPackage WOYes
ST-PSV-OVH-01Pressure Safety / Relief ValvePSV Condition-Triggered Repair / OverhaulCondition/finding triggered; no routine calendar cycle.Reliability + Maintenance / OEMPA-07 CONDITION-TRIGGERED WOEvent-triggered workflow; no routine cyclic planIndividual WONo
ST-PSV-CERT-01Pressure Safety / Relief ValvePSV Certification / Regulatory Record UpdatePer legal / certification due date. No extension without authorized basis.Inspection / Asset IntegrityPA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-FLARE-STACK-INS-01Flare / Stack / Chimney SystemFlare / Stack External Structural InspectionRisk-based periodic interval; document technical basis.Inspection / Asset IntegrityPA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-FLARE-STACK-INS-02Flare / Stack / Chimney SystemFlare Tip / Internal InspectionTurnaround/opportunity driven within integrity/reliability due window.Inspection / Asset IntegrityPA-06 TA / SHUTDOWN PACKAGETA / shutdown due-date control / packagePackage WOConditional
ST-FLARE-STACK-FT-01Flare / Stack / Chimney SystemFlare Pilot / Ignition Functional TestPer demand-readiness / Performance Standard programme.Reliability + DisciplinePA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-COOLING-INS-01Cooling TowerCooling Tower Routine InspectionPeriodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action.Inspection / Asset IntegrityPA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-COOLING-CM-01Cooling TowerCooling Tower Performance / Condition SurveillanceContinuous monitoring + approved route verification.Reliability / Condition MonitoringPA-01 MONITORING / NO ROUTINE SAP PLANNo routine SAP planNoneNo
ST-COOLING-PM-01Cooling TowerCooling Tower Preventive Service / Cleaning / LubricationPer OEM and condition history.Reliability + Maintenance DisciplinePA-04 CAMPAIGN / PACKAGE WOStrategy / single-cycle / counter campaign planPackage WOYes
ST-COOLING-FT-01Cooling TowerCooling Tower Functional / Performance TestUse approved performance-monitoring interval based on degradation/P-F interval.Reliability + DisciplinePA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-COOLING-OVH-01Cooling TowerCooling Tower Condition-Triggered Repair / RestorationCondition/finding triggered; no routine calendar cycle.Reliability + Maintenance / OEMPA-07 CONDITION-TRIGGERED WOEvent-triggered workflow; no routine cyclic planIndividual WONo
ST-SEPARATOR-INS-01Particle Collector / SeparatorParticle Collector / Separator Routine InspectionPeriodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action.Inspection / Asset IntegrityPA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-SEPARATOR-CM-01Particle Collector / SeparatorParticle Collector / Separator Performance / Condition SurveillanceContinuous monitoring + approved route verification.Reliability / Condition MonitoringPA-01 MONITORING / NO ROUTINE SAP PLANNo routine SAP planNoneNo
ST-SEPARATOR-PM-01Particle Collector / SeparatorParticle Collector / Separator Preventive Service / Cleaning / LubricationPer OEM and condition history.Reliability + Maintenance DisciplinePA-04 CAMPAIGN / PACKAGE WOStrategy / single-cycle / counter campaign planPackage WOYes
ST-SEPARATOR-FT-01Particle Collector / SeparatorParticle Collector / Separator Functional / Performance TestUse approved performance-monitoring interval based on degradation/P-F interval.Reliability + DisciplinePA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-SEPARATOR-OVH-01Particle Collector / SeparatorParticle Collector / Separator Condition-Triggered Repair / RestorationCondition/finding triggered; no routine calendar cycle.Reliability + Maintenance / OEMPA-07 CONDITION-TRIGGERED WOEvent-triggered workflow; no routine cyclic planIndividual WONo
ST-FILTER-INS-01Filter / StrainerFilter / Strainer Routine InspectionPeriodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action.Inspection / Asset IntegrityPA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-FILTER-CM-01Filter / StrainerFilter / Strainer Performance / Condition SurveillanceContinuous monitoring + approved route verification.Reliability / Condition MonitoringPA-01 MONITORING / NO ROUTINE SAP PLANNo routine SAP planNoneNo
ST-FILTER-PM-01Filter / StrainerFilter / Strainer Preventive Service / Cleaning / LubricationPer OEM and condition history.Reliability + Maintenance DisciplinePA-04 CAMPAIGN / PACKAGE WOStrategy / single-cycle / counter campaign planPackage WOYes
ST-FILTER-FT-01Filter / StrainerFilter / Strainer Functional / Performance TestUse approved performance-monitoring interval based on degradation/P-F interval.Reliability + DisciplinePA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
ST-FILTER-OVH-01Filter / StrainerFilter / Strainer Condition-Triggered Repair / RestorationCondition/finding triggered; no routine calendar cycle.Reliability + Maintenance / OEMPA-07 CONDITION-TRIGGERED WOEvent-triggered workflow; no routine cyclic planIndividual WONo
ST-VALVE-TRAP-INS-01Manual Valve / Steam TrapManual Valve / Steam Trap Routine InspectionPeriodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action.Inspection / Asset IntegrityPA-02 INSPECTION / ROUTINE NOTIFICATIONDue-date / single-cycle / strategy notification planNotificationYes
Halaman 3 / 13