Portal›Maintenance Plan
Maintenance Plan Engineering
Converts approved task logic into scheduling / trigger rules and lean SAP execution. Not every maintenance activity requires a cyclic work order.
Registered Plans - Assets
36.036
16.0% coverage
Plan Engineering Rows
314
One per maintenance task
SAP Plan Patterns
8
PA-01 through PA-08 plan patterns
Actual Call-Detail Assets
19.574
Matched from RU Sheet2
SAP Plan Patterns
| Code | Plan Pattern | Use Case | Call Object | Routine Plan? | Default Grouping | Task Rows |
|---|---|---|---|---|---|---|
| PA-01 | Monitoring / No Routine SAP Plan | Continuous/online monitoring; exception-driven action | None | No | System/area monitoring route | 37 |
| PA-02 | Inspection / Routine Notification | Simple inspection / due-date / condition route | Notification | Yes | Route/circuit/area/due window | 120 |
| PA-03 | Test / Calibration Notification | Simple test/calibration/proving | Notification | Yes | Unit + discipline + method + due window | 12 |
| PA-04 | Campaign / Package WO | Repetitive work needing resources / permit / vendor | Package WO | Yes | Area/unit + discipline/vendor + common window | 76 |
| PA-05 | Individual Planned WO | Unique asset-specific scheduled work | Individual WO | Yes | Equipment-specific | 0 |
| PA-06 | TA / Shutdown Package | Intrusive work requiring outage/TA | Package WO | Conditional | TA/unit/system/work package | 14 |
| PA-07 | Condition-Triggered WO | Repair/restoration from finding/diagnostic | Individual WO | No routine cyclic plan | Finding/equipment/defect | 54 |
| PA-08 | RTF / Corrective | Approved failure-event workflow | Corrective Notification / WO | No preventive plan | Equipment/failure event | 1 |
Maintenance Plan Engineering Library - Task ID deep-links back to the Task List.314 rows
| Task ID | Family | Task Title | Final Frequency / Trigger Rule | Owner | Plan Pattern | SAP Plan Type | Call Object | Routine? |
|---|---|---|---|---|---|---|---|---|
| ST-BOILER-PM-01 | Boiler | Boiler Burner / Soot / Draft Equipment Preventive Service | Annual formal review + condition-triggered action. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| ST-BOILER-OVH-01 | Boiler | Boiler Condition-Triggered Tube / Refractory / Burner Repair | Condition trigger; use TA opportunity where technically justified. | Reliability + Maintenance / OEM | PA-06 TA / SHUTDOWN PACKAGE | TA / shutdown due-date control / package | Package WO | Conditional |
| ST-PSV-INS-01 | Pressure Safety / Relief Valve | PSV / PRV External In-Service Inspection | Risk-based periodic interval; document technical basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-PSV-FT-01 | Pressure Safety / Relief Valve | PSV Bench Test / Set Pressure / Seat Tightness Test | Regulatory / risk / history due — final cycle to be approved by interval owner. | Reliability + Process Safety + Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| ST-PSV-OVH-01 | Pressure Safety / Relief Valve | PSV Condition-Triggered Repair / Overhaul | Condition/finding triggered; no routine calendar cycle. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| ST-PSV-CERT-01 | Pressure Safety / Relief Valve | PSV Certification / Regulatory Record Update | Per legal / certification due date. No extension without authorized basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-FLARE-STACK-INS-01 | Flare / Stack / Chimney System | Flare / Stack External Structural Inspection | Risk-based periodic interval; document technical basis. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-FLARE-STACK-INS-02 | Flare / Stack / Chimney System | Flare Tip / Internal Inspection | Turnaround/opportunity driven within integrity/reliability due window. | Inspection / Asset Integrity | PA-06 TA / SHUTDOWN PACKAGE | TA / shutdown due-date control / package | Package WO | Conditional |
| ST-FLARE-STACK-FT-01 | Flare / Stack / Chimney System | Flare Pilot / Ignition Functional Test | Per demand-readiness / Performance Standard programme. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-COOLING-INS-01 | Cooling Tower | Cooling Tower Routine Inspection | Periodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-COOLING-CM-01 | Cooling Tower | Cooling Tower Performance / Condition Surveillance | Continuous monitoring + approved route verification. | Reliability / Condition Monitoring | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| ST-COOLING-PM-01 | Cooling Tower | Cooling Tower Preventive Service / Cleaning / Lubrication | Per OEM and condition history. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| ST-COOLING-FT-01 | Cooling Tower | Cooling Tower Functional / Performance Test | Use approved performance-monitoring interval based on degradation/P-F interval. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-COOLING-OVH-01 | Cooling Tower | Cooling Tower Condition-Triggered Repair / Restoration | Condition/finding triggered; no routine calendar cycle. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| ST-SEPARATOR-INS-01 | Particle Collector / Separator | Particle Collector / Separator Routine Inspection | Periodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-SEPARATOR-CM-01 | Particle Collector / Separator | Particle Collector / Separator Performance / Condition Surveillance | Continuous monitoring + approved route verification. | Reliability / Condition Monitoring | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| ST-SEPARATOR-PM-01 | Particle Collector / Separator | Particle Collector / Separator Preventive Service / Cleaning / Lubrication | Per OEM and condition history. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| ST-SEPARATOR-FT-01 | Particle Collector / Separator | Particle Collector / Separator Functional / Performance Test | Use approved performance-monitoring interval based on degradation/P-F interval. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-SEPARATOR-OVH-01 | Particle Collector / Separator | Particle Collector / Separator Condition-Triggered Repair / Restoration | Condition/finding triggered; no routine calendar cycle. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| ST-FILTER-INS-01 | Filter / Strainer | Filter / Strainer Routine Inspection | Periodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-FILTER-CM-01 | Filter / Strainer | Filter / Strainer Performance / Condition Surveillance | Continuous monitoring + approved route verification. | Reliability / Condition Monitoring | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| ST-FILTER-PM-01 | Filter / Strainer | Filter / Strainer Preventive Service / Cleaning / Lubrication | Per OEM and condition history. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| ST-FILTER-FT-01 | Filter / Strainer | Filter / Strainer Functional / Performance Test | Use approved performance-monitoring interval based on degradation/P-F interval. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| ST-FILTER-OVH-01 | Filter / Strainer | Filter / Strainer Condition-Triggered Repair / Restoration | Condition/finding triggered; no routine calendar cycle. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| ST-VALVE-TRAP-INS-01 | Manual Valve / Steam Trap | Manual Valve / Steam Trap Routine Inspection | Periodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
Halaman 3 / 13