Portal›Maintenance Plan
Maintenance Plan Engineering
Converts approved task logic into scheduling / trigger rules and lean SAP execution. Not every maintenance activity requires a cyclic work order.
Registered Plans - Assets
36.036
16.0% coverage
Plan Engineering Rows
314
One per maintenance task
SAP Plan Patterns
8
PA-01 through PA-08 plan patterns
Actual Call-Detail Assets
19.574
Matched from RU Sheet2
SAP Plan Patterns
| Code | Plan Pattern | Use Case | Call Object | Routine Plan? | Default Grouping | Task Rows |
|---|---|---|---|---|---|---|
| PA-01 | Monitoring / No Routine SAP Plan | Continuous/online monitoring; exception-driven action | None | No | System/area monitoring route | 37 |
| PA-02 | Inspection / Routine Notification | Simple inspection / due-date / condition route | Notification | Yes | Route/circuit/area/due window | 120 |
| PA-03 | Test / Calibration Notification | Simple test/calibration/proving | Notification | Yes | Unit + discipline + method + due window | 12 |
| PA-04 | Campaign / Package WO | Repetitive work needing resources / permit / vendor | Package WO | Yes | Area/unit + discipline/vendor + common window | 76 |
| PA-05 | Individual Planned WO | Unique asset-specific scheduled work | Individual WO | Yes | Equipment-specific | 0 |
| PA-06 | TA / Shutdown Package | Intrusive work requiring outage/TA | Package WO | Conditional | TA/unit/system/work package | 14 |
| PA-07 | Condition-Triggered WO | Repair/restoration from finding/diagnostic | Individual WO | No routine cyclic plan | Finding/equipment/defect | 54 |
| PA-08 | RTF / Corrective | Approved failure-event workflow | Corrective Notification / WO | No preventive plan | Equipment/failure event | 1 |
Maintenance Plan Engineering Library - Task ID deep-links back to the Task List.314 rows
| Task ID | Family | Task Title | Final Frequency / Trigger Rule | Owner | Plan Pattern | SAP Plan Type | Call Object | Routine? |
|---|---|---|---|---|---|---|---|---|
| RT-AGITATOR-PM-01 | Agitator / Mixer / Blender | Agitator / Mixer Lubrication / Routine Preventive Service | Per OEM run-hour / start-cycle recommendation, modified by condition/history. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| RT-AGITATOR-FT-01 | Agitator / Mixer / Blender | Agitator / Mixer Functional / Performance Test | Readiness/condition check per approved operating or Performance Standard programme. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-AGITATOR-OVH-01 | Agitator / Mixer / Blender | Agitator / Mixer Condition / Run-Hour Triggered Overhaul | Whichever occurs first: approved condition limit, run-hour/start-cycle criterion, or suitable TA opportunity. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| RT-CENTRIFUGE-INS-01 | Centrifugal Purifier / Centrifuge | Centrifugal Purifier / Centrifuge Routine Mechanical Inspection | Monthly route. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-CENTRIFUGE-CM-01 | Centrifugal Purifier / Centrifuge | Centrifugal Purifier / Centrifuge Vibration / Temperature / Condition Monitoring | Continuous monitoring + monthly route. | Reliability / Condition Monitoring | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| RT-CENTRIFUGE-CM-02 | Centrifugal Purifier / Centrifuge | Centrifugal Purifier / Centrifuge Lubricant Condition / Oil Analysis | Run-hour based with sample due; use equipment counter / operating hours. | Reliability / Condition Monitoring | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-CENTRIFUGE-PM-01 | Centrifugal Purifier / Centrifuge | Centrifugal Purifier / Centrifuge Lubrication / Routine Preventive Service | Per OEM run-hour / start-cycle recommendation, modified by condition/history. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| RT-CENTRIFUGE-FT-01 | Centrifugal Purifier / Centrifuge | Centrifugal Purifier / Centrifuge Functional / Performance Test | Readiness/condition check per approved operating or Performance Standard programme. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-CENTRIFUGE-OVH-01 | Centrifugal Purifier / Centrifuge | Centrifugal Purifier / Centrifuge Condition / Run-Hour Triggered Overhaul | Whichever occurs first: approved condition limit, run-hour/start-cycle criterion, or suitable TA opportunity. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| RT-MECH-PACKAGE-INS-01 | Mechanical Package Equipment | Mechanical Package Equipment Routine Mechanical Inspection | Monthly route. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-MECH-PACKAGE-CM-01 | Mechanical Package Equipment | Mechanical Package Equipment Vibration / Temperature / Condition Monitoring | Continuous monitoring + monthly route. | Reliability / Condition Monitoring | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| RT-MECH-PACKAGE-CM-02 | Mechanical Package Equipment | Mechanical Package Equipment Lubricant Condition / Oil Analysis | Run-hour based with sample due; use equipment counter / operating hours. | Reliability / Condition Monitoring | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-MECH-PACKAGE-PM-01 | Mechanical Package Equipment | Mechanical Package Equipment Lubrication / Routine Preventive Service | Per OEM run-hour / start-cycle recommendation, modified by condition/history. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| RT-MECH-PACKAGE-FT-01 | Mechanical Package Equipment | Mechanical Package Equipment Functional / Performance Test | Readiness/condition check per approved operating or Performance Standard programme. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-MECH-PACKAGE-OVH-01 | Mechanical Package Equipment | Mechanical Package Equipment Condition / Run-Hour Triggered Overhaul | Whichever occurs first: approved condition limit, run-hour/start-cycle criterion, or suitable TA opportunity. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| RT-SOOTBLOWER-INS-01 | Boiler Sootblower | Boiler Sootblower Routine Mechanical Inspection | Monthly route. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-SOOTBLOWER-CM-01 | Boiler Sootblower | Boiler Sootblower Vibration / Temperature / Condition Monitoring | Continuous monitoring + monthly route. | Reliability / Condition Monitoring | PA-01 MONITORING / NO ROUTINE SAP PLAN | No routine SAP plan | None | No |
| RT-SOOTBLOWER-CM-02 | Boiler Sootblower | Boiler Sootblower Lubricant Condition / Oil Analysis | Run-hour based with sample due; use equipment counter / operating hours. | Reliability / Condition Monitoring | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-SOOTBLOWER-PM-01 | Boiler Sootblower | Boiler Sootblower Lubrication / Routine Preventive Service | Per OEM run-hour / start-cycle recommendation, modified by condition/history. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
| RT-SOOTBLOWER-FT-01 | Boiler Sootblower | Boiler Sootblower Functional / Performance Test | Readiness/condition check per approved operating or Performance Standard programme. | Reliability + Discipline | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| RT-SOOTBLOWER-OVH-01 | Boiler Sootblower | Boiler Sootblower Condition / Run-Hour Triggered Overhaul | Whichever occurs first: approved condition limit, run-hour/start-cycle criterion, or suitable TA opportunity. | Reliability + Maintenance / OEM | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| RT-PUMP-PM-02 | Pump / Hydraulic Motor | Pump Coupling / Alignment Verification | Event/condition triggered; no fixed cycle unless engineering later establishes one. | Reliability + Maintenance Discipline | PA-07 CONDITION-TRIGGERED WO | Event-triggered workflow; no routine cyclic plan | Individual WO | No |
| EL-MOTOR-INS-01 | Electric Motor | Electric Motor Visual / Physical Condition Inspection | Periodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action. | Inspection / Asset Integrity | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| EL-MOTOR-CM-01 | Electric Motor | Electric Motor Thermography / Electrical Condition Monitoring | Periodic baseline from OEM/site history/P-F interval; adverse condition triggers earlier action. | Reliability / Condition Monitoring | PA-02 INSPECTION / ROUTINE NOTIFICATION | Due-date / single-cycle / strategy notification plan | Notification | Yes |
| EL-MOTOR-PM-01 | Electric Motor | Electric Motor Detailed Preventive Maintenance / Cleaning / Torque Check | Per OEM requirement and planned outage window. | Reliability + Maintenance Discipline | PA-04 CAMPAIGN / PACKAGE WO | Strategy / single-cycle / counter campaign plan | Package WO | Yes |
Halaman 7 / 13