SECE Assurance & MAH Study Integration
Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.
Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite
The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.
Study Coverage by RU
Reconciliation Logic
Exact RU + equipment tag match and current portal SECE marker is already present.
Action: Preserve existing core logic; evidence strengthens traceability.
Exact RU + equipment tag match but current portal SECE marker is not set.
Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.
MAH study tag/entity has no exact RU + equipment match in the uploaded master.
Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.
Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.
Action: Do not demote. Preserve marker until study scope and evidence are reconciled.
SECE Study Register · Unique Tags
Study records are searchable without forcing them into the equipment model.
| RU | Tag | Name (Study) | Node(s) | SECE Element(s) | Status | Linked |
|---|---|---|---|---|---|---|
| RU III Plaju | CD3-PM-005/00 | REBOILER COLUMN II PUMP MOTOR | Node 2 (CD III) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-PM-006/00 | REBOILER COLUMN II PUMP MOTOR | Node 2 (CD III) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-PM-83-11A/00 | REBOILING STAB PUMP MOTOR | Node 2 (CD III) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-PSV-258/00 | PSV COLOUMN 1-4 | Node 2 (CD III) | Pressure Safety Valve | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-PV-8342/00 | FUEL GAS F2-C1 CONTROL VALVE 83PV8342 | Node 2 (CD III) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD3-PV-8343/00 | FUEL GAS F2-C2 CONTROL VALVE 83PV8343 | Node 2 (CD III) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD3-PV-8344/00 | FUEL GAS F1 CONTROL VALVE 83PV8344 | Node 2 (CD III) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD3-PV-8345/00 | FUEL GAS F1 CONTROL VALVE 83PV8345 | Node 2 (CD III) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD3-T-003/00 | HALF RESIDUE PUMP DRIVER TURBINE | Node 2 (CD III) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-T-004/00 | HO.TR. COLUMN Z-1 PUMP TURBINE | Node 2 (CD III) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-T-011/00 | CRUDE OIL TRANSFER TO C-1 PUMP TURBINE | Node 2 (CD III) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-T-012/00 | REBOILING STAB PUMP TURBINE T-012 CD3 | Node 2 (CD III) | Pumps | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | CD3-TT-8302/00 | OUTLET F-1 TEMP TRANSMITTER 83-TT-8302 | Node 2 (CD III) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD3-TT-8303/00 | OUTLET F-1 TEMP TRANSMITTER 83-TT-8303 | Node 2 (CD III) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD3-TT-8304/00 | OUTLET F-1 TEMP TRANSMITTER 83-TT-8304 | Node 2 (CD III) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD3-TT-8305/00 | OUTLET F-1THERMO TRANSMITTER 83-TT-8305 | Node 2 (CD III) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-84-XV-001/00 | SCE - FUEL GAS CONTROL VALVE 84XV001 | Node 3 (CD IV) | Shutdown Valve (XCV, SOV) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-84-XV-002/00 | SCE - FUEL OIL CONTROL VALVE 84XV002 | Node 3 (CD IV) | Shutdown Valve (XCV, SOV) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-84-XV-003/00 | SCE-STACK DAMPER CONTROL VALVE CD4 HC001 | Node 3 (CD IV) | Shutdown Valve (XCV, SOV) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-F-1/00 | FURNACE CD4-F-1 | Node 3 (CD IV) | Fired Heater | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-F-2/00 | FURNACE CD4-F-2 | Node 3 (CD IV) | Fired Heater | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FT-8401/00 | INTAKE CRUDE FLOW TRANSMITTER 84FT8401 | Node 3 (CD IV) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FT-8414/00 | BOTTOM COL-1 TO COL-2 FLOW CD4FT8414 | Node 3 (CD IV) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FT-8415/00 | REBOILING FLOW TRANSMITTER CD4FT8415 | Node 3 (CD IV) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FT-8416/00 | REBOILING FLOW TRANSMITTER CD4FT8416 | Node 3 (CD IV) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FT-8431/00 | BOTT-OM FLOW TRANSMITTER 84FT8431 | Node 3 (CD IV) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FV-8401/00 | INTAKE CRUDE CONTROL VALVE 84FV8401 | Node 3 (CD IV) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FV-8414/00 | BOTTOM COL-1 CONTROL VALVE 84FV8414 | Node 3 (CD IV) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FV-8415/00 | CONTROL VALVE 84FV8415 | Node 3 (CD IV) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FV-8416/00 | CONTROL VALVE 84FV8416 | Node 3 (CD IV) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-FV-8431/00 | BOTT-OM STAB CONTROL VALVE 84FV8431 | Node 3 (CD IV) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-MCC-PM-006 | Node 3 (CD IV) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU III Plaju | CD4-MCC-PM-007/00 | LV CONTROL MOTOR PM-007 | Node 3 (CD IV) | Electrical Motor Control | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-MCC-PM-008/00 | LV CONTROL MOTOR PM-008 | Node 3 (CD IV) | Electrical Motor Control | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-P-005/00 | REBOILER COL 2 PUMP P-005 CD4 | Node 3 (CD IV) | Pumps | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-P-006/01 | REBOILING COL 2 PUMP | Node 3 (CD IV) | Pumps | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-P-007/00 | TRANSFER COL I TO COL II PUMP P-007 CD4 | Node 3 (CD IV) | Pumps | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-P-008/00 | TRANSFER COLUMN 1-2 PUMP P-008 CD4 | Node 3 (CD IV) | Pumps | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-P-009/00 | REBOILER COL NO I PUMP P-009 CD4 | Node 3 (CD IV) | Pumps | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | CD4-P-010/00 | TRANSFER STAB.TO COL I PUMP P-010 CD4 | Node 3 (CD IV) | Pumps | MAH Confirmed · Existing Marker | Yes |
Study Node Coverage
| RU | Phase | Node | Study Tag Rows |
|---|---|---|---|
| RU III Plaju | Phase 1 | Node 1 (CD II) | 164 |
| RU III Plaju | Phase 1 | Node 2 (CD III) | 88 |
| RU III Plaju | Phase 1 | Node 3 (CD IV) | 104 |
| RU III Plaju | Phase 2 | Node 04 (CDU V) | 110 |
| RU III Plaju | Phase 2 | Node-05 (STAB C) | 82 |
| RU III Plaju | Phase 2 | Node-07 (Alkylation) | 102 |
| RU III Plaju | Phase 2 | Node-08 (C4 Poly) | 78 |
| RU VI Balongan | Phase 1 | Node 3 (Spherical Tank) | 673 |
| RU VI Balongan | Phase 1 | Node 5 (Intermediate Tank) | 305 |
| RU VI Balongan | Phase 1 | Node 8 (EWTP) | 24 |
| RU VI Balongan | Phase 2 | Node 1 (Jetty) | 61 |
| RU VI Balongan | Phase 2 | Node 2 (SPM&SPL) | 27 |
| RU VI Balongan | Phase 2 | Node 4 (Feed Tanks) | 555 |
| RU VI Balongan | Phase 2 | Node 6 (Product Tanks) | 404 |
| RU VII Kasim | Phase 1 | Node 1 (CDU) | 144 |
| RU VII Kasim | Phase 1 | Node 2 (NHTU) | 19 |
| RU VII Kasim | Phase 2 | Node 3 (CRU) | 42 |
| RU VII Kasim | Phase 2 | Node 4 (OM) | 303 |
| RU VII Kasim | Phase 2 | Node 5-10 (Utility) | 18 |
| TOTAL | 3303 | ||
| Tag Number unik (setelah dedup) | 3236 |
Entity-Resolution Concentration
SECE elements with the highest count of study entities not exact-linked to Equipment Master.
| RU | SECE Element | Study Unique | Linked | Unlinked |
|---|---|---|---|---|
| RU VI Balongan | Pipework (Within Plant) | 396 | 167 | 229 |
| RU VI Balongan | Fixed Fire Water Distribution | 189 | 58 | 131 |
| RU VI Balongan | Flame Detector and Alarm | 129 | 0 | 129 |
| RU VI Balongan | Emergency Alarms (Siren) | 91 | 0 | 91 |
| RU VII Kasim | Structural Support | 55 | 0 | 55 |
| RU VI Balongan | IR Open Path Gas Detector | 52 | 0 | 52 |
| RU VI Balongan | Electrical Motor Control | 64 | 17 | 47 |
| RU VI Balongan | Motor Operated Valve (MOV, EIV) | 211 | 177 | 34 |
| RU VI Balongan | Inert Function | 65 | 33 | 32 |
| RU VI Balongan | Catalytic Point Gas Detector | 83 | 55 | 28 |
| RU VI Balongan | Pressure Safety Valve | 57 | 30 | 27 |
| RU VI Balongan | Cathodic Protection | 19 | 0 | 19 |