SECE Assurance & MAH Study Integration
Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.
Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite
The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.
Study Coverage by RU
Reconciliation Logic
Exact RU + equipment tag match and current portal SECE marker is already present.
Action: Preserve existing core logic; evidence strengthens traceability.
Exact RU + equipment tag match but current portal SECE marker is not set.
Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.
MAH study tag/entity has no exact RU + equipment match in the uploaded master.
Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.
Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.
Action: Do not demote. Preserve marker until study scope and evidence are reconciled.
SECE Study Register · Unique Tags
Study records are searchable without forcing them into the equipment model.
| RU | Tag | Name (Study) | Node(s) | SECE Element(s) | Status | Linked |
|---|---|---|---|---|---|---|
| RU VI Balongan | 23-PMC3-02B-F25D/00 | Node 5 (Intermediate Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B-F26C/00 | Node 5 (Intermediate Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B-R22E/00 | Node 3 (Spherical Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B-R22F/00 | Node 3 (Spherical Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B-R23B/00 | Node 3 (Spherical Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B-R24C/00 | Node 5 (Intermediate Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B-R24D/00 | Node 5 (Intermediate Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B-R24E/00 | Node 5 (Intermediate Tank) | Electrical Motor Control | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 23-PMC3-02B/00 | 400V MOTOR CONTROL CENTER 23-PMC3-02B | Node 3 (Spherical Tank) | Electrical Motor Control | MAH Identified · Marker Reconciliation | Yes |
| RU VI Balongan | 23-PMC3-03/00 | 400V MOTOR CONTROL CENTER 23-PMC3-03 | Node 3 (Spherical Tank) | Electrical Motor Control | MAH Identified · Marker Reconciliation | Yes |
| RU VI Balongan | 23A-PBA3-01/00 | BATTERY 23A-PBA3-01 | Node 1 (Jetty) | Uninterruptible Power Supplies | MAH Identified · Marker Reconciliation | Yes |
| RU VI Balongan | 23A-PBC3-01A/00 | DC CHARGER 125V DC 23A-PBC3-01 | Node 1 (Jetty) | Uninterruptible Power Supplies | MAH Identified · Marker Reconciliation | Yes |
| RU VI Balongan | 23A-PBC3-01B/00 | DC CHARGER 125V DC 23A-PBC3-01 | Node 1 (Jetty) | Uninterruptible Power Supplies | MAH Identified · Marker Reconciliation | Yes |
| RU VI Balongan | 23A-PBC3-01C/00 | DC CHARGER 125V DC 23A-PBC3-01C | Node 1 (Jetty) | Uninterruptible Power Supplies | MAH Identified · Marker Reconciliation | Yes |
| RU III Plaju | 24-F-1/00 | FURNACE I ALKYLATION UNIT 24-F-1 | Node-07 (Alkylation) | Fired Heater | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FT-245/00 | REFLUX TO 1-1 FLOW TRANSMITTER 24FT245 | Node-07 (Alkylation) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FT-742/00 | HOT OIL TO F-1 FLOW TRANSMITTER 24FT742 | Node-07 (Alkylation) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FT-761/00 | REFLUX TO 1-2 FLOW TRANSMITTER 24FT761 | Node-07 (Alkylation) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FT-764/00 | FEED TO 1-2 FLOW TRANSMITTER 24FT764 | Node-07 (Alkylation) | Flow Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FV-245/00 | REFLUX TO 1-1 CONTROL VALVE 24FV245 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FV-742/00 | HOT OIL TO F-1 CONTROL VALVE ALK FV742 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FV-761/00 | REFLUX TO 1-2 CONTROL VALVE ALK FV761 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-FV-764/00 | FLOW VALVE FEED CONTROL VALVE 24FV764 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PT-709/00 | FUEL GAS PRESSURE TRANSMITTER 24PT709 | Node-07 (Alkylation) | Pressure Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PT-731/00 | HOT OIL PRESSURE TRANSMITTER 24PT731 | Node-07 (Alkylation) | Pressure Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PT-735/00 | DEISOBUTHAN PRESSURE TRANSMITTER 24PT735 | Node-07 (Alkylation) | Pressure Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PT-753/00 | STABILIZER PRESSURE TRANSMITTER 24PT753 | Node-07 (Alkylation) | Pressure Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PT-754/00 | DEISOBUTHAN PRESSURE TRANSMITTER 24PT754 | Node-07 (Alkylation) | Pressure Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PV-705/00 | FUEL GAS PRESSURE VONTROL VALVE 24PV705 | Node-07 (Alkylation) | Shutdown Valve (XCV, SOV) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PV-709/00 | FUEL GAS PRESSURE CONTROL VALVE 24PV709 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PV-731/00 | HOT OIL PRESSURE CONTROL VALVE ALK PV731 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PV-735/00 | DEISOBUTHANE 1-1 VONTROL VALVE 24PV735 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-PV-753/00 | STABILIZER 1-2 CONTROL VALVE ALKPV753 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-TT-101/00 | TUBE SKIN TEMP. HOT OIL FURNACE 101 ALK | Node-07 (Alkylation) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-TT-102/00 | TUBE SKIN TEMP. HOT OIL FURNACE 102 ALK | Node-07 (Alkylation) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-TV-737/00 | TEMP VALVE TRAY CONTROL VALVE 24TV737 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 24-TV-738/00 | TEMP 7-4 REBOILER CONTROL VALVE 24TV738 | Node-07 (Alkylation) | Control Valve | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 26PSV001 | Node-08 (C4 Poly) | Pressure Safety Valve | Study Entity · Not Linked to Equipment Master | - | |
| RU III Plaju | 26PSV002 | Node-08 (C4 Poly) | Pressure Safety Valve | Study Entity · Not Linked to Equipment Master | - | |
| RU III Plaju | 26PSV004 | Node-08 (C4 Poly) | Pressure Safety Valve | Study Entity · Not Linked to Equipment Master | - |
Study Node Coverage
| RU | Phase | Node | Study Tag Rows |
|---|---|---|---|
| RU III Plaju | Phase 1 | Node 1 (CD II) | 164 |
| RU III Plaju | Phase 1 | Node 2 (CD III) | 88 |
| RU III Plaju | Phase 1 | Node 3 (CD IV) | 104 |
| RU III Plaju | Phase 2 | Node 04 (CDU V) | 110 |
| RU III Plaju | Phase 2 | Node-05 (STAB C) | 82 |
| RU III Plaju | Phase 2 | Node-07 (Alkylation) | 102 |
| RU III Plaju | Phase 2 | Node-08 (C4 Poly) | 78 |
| RU VI Balongan | Phase 1 | Node 3 (Spherical Tank) | 673 |
| RU VI Balongan | Phase 1 | Node 5 (Intermediate Tank) | 305 |
| RU VI Balongan | Phase 1 | Node 8 (EWTP) | 24 |
| RU VI Balongan | Phase 2 | Node 1 (Jetty) | 61 |
| RU VI Balongan | Phase 2 | Node 2 (SPM&SPL) | 27 |
| RU VI Balongan | Phase 2 | Node 4 (Feed Tanks) | 555 |
| RU VI Balongan | Phase 2 | Node 6 (Product Tanks) | 404 |
| RU VII Kasim | Phase 1 | Node 1 (CDU) | 144 |
| RU VII Kasim | Phase 1 | Node 2 (NHTU) | 19 |
| RU VII Kasim | Phase 2 | Node 3 (CRU) | 42 |
| RU VII Kasim | Phase 2 | Node 4 (OM) | 303 |
| RU VII Kasim | Phase 2 | Node 5-10 (Utility) | 18 |
| TOTAL | 3303 | ||
| Tag Number unik (setelah dedup) | 3236 |
Entity-Resolution Concentration
SECE elements with the highest count of study entities not exact-linked to Equipment Master.
| RU | SECE Element | Study Unique | Linked | Unlinked |
|---|---|---|---|---|
| RU VI Balongan | Pipework (Within Plant) | 396 | 167 | 229 |
| RU VI Balongan | Fixed Fire Water Distribution | 189 | 58 | 131 |
| RU VI Balongan | Flame Detector and Alarm | 129 | 0 | 129 |
| RU VI Balongan | Emergency Alarms (Siren) | 91 | 0 | 91 |
| RU VII Kasim | Structural Support | 55 | 0 | 55 |
| RU VI Balongan | IR Open Path Gas Detector | 52 | 0 | 52 |
| RU VI Balongan | Electrical Motor Control | 64 | 17 | 47 |
| RU VI Balongan | Motor Operated Valve (MOV, EIV) | 211 | 177 | 34 |
| RU VI Balongan | Inert Function | 65 | 33 | 32 |
| RU VI Balongan | Catalytic Point Gas Detector | 83 | 55 | 28 |
| RU VI Balongan | Pressure Safety Valve | 57 | 30 | 27 |
| RU VI Balongan | Cathodic Protection | 19 | 0 | 19 |