SECE Assurance & MAH Study Integration
Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.
Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite
The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.
Study Coverage by RU
Reconciliation Logic
Exact RU + equipment tag match and current portal SECE marker is already present.
Action: Preserve existing core logic; evidence strengthens traceability.
Exact RU + equipment tag match but current portal SECE marker is not set.
Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.
MAH study tag/entity has no exact RU + equipment match in the uploaded master.
Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.
Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.
Action: Do not demote. Preserve marker until study scope and evidence are reconciled.
SECE Study Register · Unique Tags
Study records are searchable without forcing them into the equipment model.
| RU | Tag | Name (Study) | Node(s) | SECE Element(s) | Status | Linked |
|---|---|---|---|---|---|---|
| RU III Plaju | 27-FGFG-CCR/00 | FGDS CCR GAS PLANT | Node-08 (C4 Poly) | FGS Human Machine Interface (HMI) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-GDF-012/00 | COMBUSTIBLE GAS DETECTOR GDF-12 | Node-08 (C4 Poly) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-GDF-013/00 | COMBUSTIBLE GAS DETECTOR GDF-13 | Node-08 (C4 Poly) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-GDF-029/00 | COMBUSTIBLE GAS DETECTOR 26-GDF-029 | Node-08 (C4 Poly) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-GDF-031/00 | COMBUSTIBLE GAS DETECTOR 26-GDF-031 | Node-08 (C4 Poly) | IR Gas Detector | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-040-8/00 | Line Conventer 2-1 to Suction Pompa P-13 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-050-2/00 | Line Conventer 2-1 s/d 2-9 to Colomn 1-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-050-4/00 | Line Conventer 2-1 s/d 2-9 to Colomn 1-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-050-6/00 | Line Conventer 2-1 s/d 2-9 to Colomn 1-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-060-2/00 | Line Conv. 2-1 s/d 2-9 to Surge Tank 9-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-060-4/00 | Line Conv. 2-1 s/d 2-9 to Surge Tank 9-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-140-8/00 | Line Conventer 2-9 to Suction Pompa P-21 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-210-2/00 | Line Discharge Pompa P-1 to HE 6-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-210-3/00 | Line Discharge Pompa P-1 to HE 6-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-220-2/00 | Line Disch. P-1/2/3/4 to HE 6-1/3/5 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-220-3/00 | Line Disch. P-1/2/3/4 to HE 6-1/3/5 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-230-6/00 | Line Disch. Pompa P-13 to Conventer 2-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-240-3/00 | Line Disch. Pompa P-13/14/15 to HE 6-1 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-370-6/00 | Line Disch.Pompa P-21 to Conventer 2-9 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-410-2/00 | Line HE 6-1/2 to Conventer 2-1/2/3 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-43P19/00 | OUTLET FROM COOLER 4-3 TO POMPA P-19 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-43P20/00 | OUTLET FROM COOLER 4-3 TO POMPA P-20 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-P1943/00 | LINE DISCHARGE P-19 TO INLET COOLER 4-3 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-P2043/00 | LINE DISCHARGE P-20 TO INLET COOLER 4-3 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-P2143/00 | LINE DISCHARGE P-21 TO INLET COOLER 4-3 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-PICA-P3P21/00 | OUTLET FROM COOLER 4-3 TO POMPA P-21 | Node-08 (C4 Poly) | Pipework (Within Plant) | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-TT-101/00 | TUBE SKIN TEMP. HOT OIL FURNACE 101 C4P | Node-08 (C4 Poly) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 27-TT-102/00 | TUBE SKIN TEMP. HOT OIL FURNACE 102 C4P | Node-08 (C4 Poly) | Temperature Initiator | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 28-SR-1G/00 | BATTERY CHARGER SS#28 | Node-07 (Alkylation) | Uninterruptible Power Supplies | MAH Confirmed · Existing Marker | Yes |
| RU III Plaju | 28-UPS-A1/00 | UPS CONTROL ROOM ALKILASI 12KVA | Node-07 (Alkylation) | Uninterruptible Power Supplies | MAH Confirmed · Existing Marker | Yes |
| RU VI Balongan | 3" manual valve on discharge pump | Node 3 (Spherical Tank) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VI Balongan | 3" manual valve on spillback line pump | Node 3 (Spherical Tank) | Pipework (Within Plant) | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 3-1-P116-A1-H/00 | OUTL TUBE SIDE 1-E-04B TO INL 1-V-01 | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 3-1-P117-A1-H/00 | OUTL SHELL SIDE 1-E-04A TO INL 1-E-21A/B | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 3-1-P119-A1-H/00 | OUTL TUBE SIDE 1-E-01 TO SUCT 2-P-01A/B | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 3-1-P121-A1-H/00 | OUTL TUBE SIDE 1-E-03A TO SUCT 1-P-06A/B | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 3-1-P121-A1-H/00 (SS) | Node 1 (CDU) | Structural Support | Study Entity · Not Linked to Equipment Master | - | |
| RU VII Kasim | 3-1-P122-A1-PP/00 | OUTLET TUBE SIDE 1-E-02 TO INLET 1-EA-03 | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 3-1-P123-A1-NI/00 | OUTL 1-EA-03&OUTL 1-LV-103 TO 5-T-13/14 | Node 1 (CDU) | Pipework (Within Plant) | MAH Identified · Marker Reconciliation | Yes |
| RU VII Kasim | 3-1-P123-A1-NI/00 (SS) | Node 1 (CDU) | Structural Support | Study Entity · Not Linked to Equipment Master | - |
Study Node Coverage
| RU | Phase | Node | Study Tag Rows |
|---|---|---|---|
| RU III Plaju | Phase 1 | Node 1 (CD II) | 164 |
| RU III Plaju | Phase 1 | Node 2 (CD III) | 88 |
| RU III Plaju | Phase 1 | Node 3 (CD IV) | 104 |
| RU III Plaju | Phase 2 | Node 04 (CDU V) | 110 |
| RU III Plaju | Phase 2 | Node-05 (STAB C) | 82 |
| RU III Plaju | Phase 2 | Node-07 (Alkylation) | 102 |
| RU III Plaju | Phase 2 | Node-08 (C4 Poly) | 78 |
| RU VI Balongan | Phase 1 | Node 3 (Spherical Tank) | 673 |
| RU VI Balongan | Phase 1 | Node 5 (Intermediate Tank) | 305 |
| RU VI Balongan | Phase 1 | Node 8 (EWTP) | 24 |
| RU VI Balongan | Phase 2 | Node 1 (Jetty) | 61 |
| RU VI Balongan | Phase 2 | Node 2 (SPM&SPL) | 27 |
| RU VI Balongan | Phase 2 | Node 4 (Feed Tanks) | 555 |
| RU VI Balongan | Phase 2 | Node 6 (Product Tanks) | 404 |
| RU VII Kasim | Phase 1 | Node 1 (CDU) | 144 |
| RU VII Kasim | Phase 1 | Node 2 (NHTU) | 19 |
| RU VII Kasim | Phase 2 | Node 3 (CRU) | 42 |
| RU VII Kasim | Phase 2 | Node 4 (OM) | 303 |
| RU VII Kasim | Phase 2 | Node 5-10 (Utility) | 18 |
| TOTAL | 3303 | ||
| Tag Number unik (setelah dedup) | 3236 |
Entity-Resolution Concentration
SECE elements with the highest count of study entities not exact-linked to Equipment Master.
| RU | SECE Element | Study Unique | Linked | Unlinked |
|---|---|---|---|---|
| RU VI Balongan | Pipework (Within Plant) | 396 | 167 | 229 |
| RU VI Balongan | Fixed Fire Water Distribution | 189 | 58 | 131 |
| RU VI Balongan | Flame Detector and Alarm | 129 | 0 | 129 |
| RU VI Balongan | Emergency Alarms (Siren) | 91 | 0 | 91 |
| RU VII Kasim | Structural Support | 55 | 0 | 55 |
| RU VI Balongan | IR Open Path Gas Detector | 52 | 0 | 52 |
| RU VI Balongan | Electrical Motor Control | 64 | 17 | 47 |
| RU VI Balongan | Motor Operated Valve (MOV, EIV) | 211 | 177 | 34 |
| RU VI Balongan | Inert Function | 65 | 33 | 32 |
| RU VI Balongan | Catalytic Point Gas Detector | 83 | 55 | 28 |
| RU VI Balongan | Pressure Safety Valve | 57 | 30 | 27 |
| RU VI Balongan | Cathodic Protection | 19 | 0 | 19 |