Portal›SECE Assurance

SECE Assurance & MAH Study Integration

Enterprise-level evidence, reconciliation and governance layer connecting the MAH SECE register to the Maintenance Strategy Portal without altering core maintenance logic.

MAH Study → Equipment Master → Maintenance Governance

Keep study evidence authoritative without turning it into an uncontrolled master-data overwrite

The MAH register is preserved as a separate evidence domain. Exact RU + tag matching creates traceable links to equipment; conflicts become governed reconciliation actions.

Study Scope
3/6 RU
RU III Plaju · RU VI Balongan · RU VII Kasim
Unique MAH Tags
3.236
3303 study rows · 49 multi-occurrence
Exact Equipment Link
2.115
65.4% of unique study tags
Unlinked Study Entities
1.121
Classify before any master-data conclusion
Marker Reconciliation
725
MAH-linked equipment without current core marker
Legacy Marker Review
726
Existing marker outside current study register
Critical interpretation: "unlinked" does not mean "bad equipment master." The MAH study contains equipment, pipework, structures, systems and other barrier elements.

Study Coverage by RU

RU III Plaju
711unique tags
646linked
65unlinked
51reconciliation
515legacy outside
22707master equip.
RU VI Balongan
2014unique tags
1047linked
967unlinked
278reconciliation
4legacy outside
39667master equip.
RU VII Kasim
511unique tags
422linked
89unlinked
396reconciliation
207legacy outside
3170master equip.

Reconciliation Logic

MAH Confirmed · Existing Marker1.390

Exact RU + equipment tag match and current portal SECE marker is already present.

Action: Preserve existing core logic; evidence strengthens traceability.

MAH Identified · Marker Reconciliation725

Exact RU + equipment tag match but current portal SECE marker is not set.

Action: Do not auto-write. Raise controlled reconciliation/change request before core marker changes.

Study Entity · Not Linked to Equipment Master1.121

MAH study tag/entity has no exact RU + equipment match in the uploaded master.

Action: Classify as equipment, FLOC, line, system/facility barrier element, formatting issue, or genuine master-data gap.

Existing Marker · Outside Current Study Register726

Current portal SECE marker exists, but the equipment is absent from the currently uploaded MAH study register.

Action: Do not demote. Preserve marker until study scope and evidence are reconciled.

SECE Study Register · Unique Tags

Study records are searchable without forcing them into the equipment model.

3.236 matching tags
RUTagName (Study)Node(s)SECE Element(s)StatusLinked
RU VII Kasim3-1-P125-A1-H/00DISCHARGE 1-P-01A/B TO INLET 3-EA-02Node 1 (CDU)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-1-P125-A1-H/00 (SS)Node 1 (CDU)Structural SupportStudy Entity · Not Linked to Equipment Master-
RU VII Kasim3-1-P126-A1-PP/00OUTL TUBE SIDE 1-E-03A TO INL 1-EA-04Node 1 (CDU)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-1-P126-A1-PP/00 (SS)Node 1 (CDU)Structural SupportStudy Entity · Not Linked to Equipment Master-
RU VII Kasim3-1-P127-A1-NI/00OUTL 1-EA-04&OUTL 1-LV-104 TO 5-T-16/17Node 1 (CDU)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-1-P127-A1-NI/00 (SS)Node 1 (CDU)Structural SupportStudy Entity · Not Linked to Equipment Master-
RU VII Kasim3-2-P226-A1-H/00OUTL SHELL SIDE 2-E-04 TO INL TOP 2-R-02Node 2 (NHTU)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-2-P226-A1-H/00 (SS)Node 2 (NHTU)Structural SupportStudy Entity · Not Linked to Equipment Master-
RU VII Kasim3-2-P227-A1-H/00OUTLET 2-R-02 TO SUCTION 3-P-01A/BNode 2 (NHTU)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-2-P227-A1-H/00 (SS)Node 2 (NHTU)Structural SupportStudy Entity · Not Linked to Equipment Master-
RU VII Kasim3-2-P280-A1-H/00OUTL SHELL SIDE 2-E-04 TO INL 2-LV-111Node 2 (NHTU)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-2-P280-A1-H/00 (SS)Node 2 (NHTU)Structural SupportStudy Entity · Not Linked to Equipment Master-
RU VII Kasim3-4-P371-A1-NI/00XDCR 3 X 2 DISCH 4-P-01A/B TO 5-T-25/26Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P403-A1-NIOUT LN 5-T-03/04Node 4 (OM)Pipework (Within Plant)Study Entity · Not Linked to Equipment Master-
RU VII Kasim3-5-P403-A1-NI (SS)Node 4 (OM)Structural SupportStudy Entity · Not Linked to Equipment Master-
RU VII Kasim3-5-P408-A1-NI/00OUT 3-EA-03/LN 3-3-P533 TO IN 5-T-23/24Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P421-A1-NI/00OUT 3-EA-03 LN 3-3-P503 TO IN 5-T-07/08Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P445-A1-NI/00DISCH 5-P-25A/B TO IN 2-P-01/LN 3-2-P201Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P446-A1-NI/00LINE NO. 3-2-P229 TO INL 5-T-06Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P448-A1-NI/00DISCH 5-P-16A/B TO 2-E-04/NO. 3-5-P478Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P457-A1-NI/00LINE NO. 3-1-P123 TO INL 5-T-13/14/15Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P463-A1-NI/00LINE NO. 3-1-P127 TO INL 5-T-16/17/18Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-P478-A1-NI/00DISCH 5-P-16A/B TO IN 2-E-04/LN 3-2-P223Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-5-SH435-B1A-H/00LINE STEAM TO 5-T-20/21/22Node 4 (OM)Pipework (Within Plant)MAH Identified · Marker ReconciliationYes
RU VII Kasim3-EA-02/00REACTOR EFFLUENT COOLERNode 3 (CRU)ExchangersMAH Identified · Marker ReconciliationYes
RU VII Kasim3-F-01/00NO 1 REACTOR HEATERNode 3 (CRU)Fired HeaterMAH Identified · Marker ReconciliationYes
RU VII Kasim3-FV-104/00HYDROGEN RECYCLE FLOW VALVENode 3 (CRU)Control ValveMAH Identified · Marker ReconciliationYes
RU VII Kasim3-K-01A/00CRU RECYCLE COMPRESSOR ANode 3 (CRU)CompressorMAH Identified · Marker ReconciliationYes
RU VII Kasim3-K-01B/00CRU RECYCLE COMPRESSOR BNode 3 (CRU)CompressorMAH Identified · Marker ReconciliationYes
RU VII Kasim3-LG-108/00LEVEL GLASS FOR 3-V-02Node 3 (CRU)Level InitiatorMAH Identified · Marker ReconciliationYes
RU VII Kasim3-LSHH-412/00LVL SWITCH HH AT 3-V-03Node 3 (CRU)Level InitiatorMAH Confirmed · Existing MarkerYes
RU VII Kasim3-LV-108A/00REFORMER HIGH PRESSURE SEP LEVEL VLVNode 3 (CRU)Control ValveMAH Identified · Marker ReconciliationYes
RU VII Kasim3-PSV-175A/00CRUDE RECY COMP DISCH PRESS SAFETY VLVNode 3 (CRU)Pressure Safety ValveMAH Confirmed · Existing MarkerYes
RU VII Kasim3-PSV-175B/00CRUDE RECY COMP DISCH PRESS SAFETY VLVNode 3 (CRU)Pressure Safety ValveMAH Confirmed · Existing MarkerYes
RU VII Kasim3-PSV-177A/00CRUDE RECY COMP SUCTION PRESS SAFETY VLVNode 3 (CRU)Pressure Safety ValveMAH Confirmed · Existing MarkerYes
RU VII Kasim3-PSV-177B/00CRUDE RECY COMP SUCTION PRESS SAFETY VLVNode 3 (CRU)Pressure Safety ValveMAH Confirmed · Existing MarkerYes
RU VII Kasim3-R-01/00NO 1 REACTORNode 3 (CRU)Pressurized Hydrocarbon Process Vessels / ColumnMAH Identified · Marker ReconciliationYes
RU VII Kasim3-R-02/00NO 2 REACTORNode 3 (CRU)Pressurized Hydrocarbon Process Vessels / ColumnMAH Identified · Marker ReconciliationYes
RU VII Kasim3-R-03/00NO 3 REACTORNode 3 (CRU)Pressurized Hydrocarbon Process Vessels / ColumnMAH Identified · Marker ReconciliationYes
RU VII Kasim3-TV-106/00REACT EFFL TO HP SEP TEMP VALVENode 3 (CRU)Control ValveMAH Confirmed · Existing MarkerYes
Halaman 9 / 81

Study Node Coverage

RUPhaseNodeStudy Tag Rows
RU III PlajuPhase 1Node 1 (CD II)164
RU III PlajuPhase 1Node 2 (CD III)88
RU III PlajuPhase 1Node 3 (CD IV)104
RU III PlajuPhase 2Node 04 (CDU V)110
RU III PlajuPhase 2Node-05 (STAB C)82
RU III PlajuPhase 2Node-07 (Alkylation)102
RU III PlajuPhase 2Node-08 (C4 Poly)78
RU VI BalonganPhase 1Node 3 (Spherical Tank)673
RU VI BalonganPhase 1Node 5 (Intermediate Tank)305
RU VI BalonganPhase 1Node 8 (EWTP)24
RU VI BalonganPhase 2Node 1 (Jetty)61
RU VI BalonganPhase 2Node 2 (SPM&SPL)27
RU VI BalonganPhase 2Node 4 (Feed Tanks)555
RU VI BalonganPhase 2Node 6 (Product Tanks)404
RU VII KasimPhase 1Node 1 (CDU)144
RU VII KasimPhase 1Node 2 (NHTU)19
RU VII KasimPhase 2Node 3 (CRU)42
RU VII KasimPhase 2Node 4 (OM)303
RU VII KasimPhase 2Node 5-10 (Utility)18
TOTAL3303
Tag Number unik (setelah dedup)3236

Entity-Resolution Concentration

SECE elements with the highest count of study entities not exact-linked to Equipment Master.

RUSECE ElementStudy UniqueLinkedUnlinked
RU VI BalonganPipework (Within Plant)396167229
RU VI BalonganFixed Fire Water Distribution18958131
RU VI BalonganFlame Detector and Alarm1290129
RU VI BalonganEmergency Alarms (Siren)91091
RU VII KasimStructural Support55055
RU VI BalonganIR Open Path Gas Detector52052
RU VI BalonganElectrical Motor Control641747
RU VI BalonganMotor Operated Valve (MOV, EIV)21117734
RU VI BalonganInert Function653332
RU VI BalonganCatalytic Point Gas Detector835528
RU VI BalonganPressure Safety Valve573027
RU VI BalonganCathodic Protection19019
A
Maintenance Strategy AssistantLevel 1 · Engineering Question Catalog · Offline · Evidence-grounded
Current context
Portal · SECE Assurance