Portal›Maintenance Strategy

Maintenance Strategy Library

Corporate Catalog Profile Master. Use filters to move from portfolio profile to the affected equipment population without loading hundreds of rows into one long page.

Catalog Profiles
453
Corporate master
Fully Approved
411
No profile-level action
Profiles Requiring Action
42
Data quality / reclassification / master update
Equipment on Action Profiles
40.982
Close gate before mass build
Catalog Profile Master453 profiles
ProfileProfile TextEquipment FamilyFinal GMSEquipmentStrategy RefTask PackageCore / Cond.StatusImplementation Gate
0101TANK, CONE RF, ATM/LOW PRESSStorage TankGMS TANK812STR-0101ST-TANK3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0102TANK, DOME RF, ATM/LOW PRESSStorage TankGMS TANK52STR-0102ST-TANK3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0103TANK, DOME ROOF, CRYOGENICCryogenic / Refrigerated Storage TankGMS TANK - CRYOGENIC12STR-0103ST-TANK-CRYO3/3APPROVED – MASTER DATA UPDATEG2 - MASTER DATA UPDATE BEFORE MASS BUILD
0104TANK, UMBR.RF. ATM/LOW PRESSStorage TankGMS TANK62STR-0104ST-TANK3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0105TANK, FLOATING ROOFStorage TankGMS TANK151STR-0105ST-TANK3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0106TANK, OPEN ROOFStorage TankGMS TANK94STR-0106ST-TANK3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0107TANK, DEGASSESStorage TankGMS TANK10STR-0107ST-TANK3/2APPROVED WITH DATA-QUALITY ACTIONG1 - DATA QUALITY ACTION
0108TANK, NON METALLICNon-Metallic Storage TankGMS TANK - NON-METALLIC42STR-0108ST-TANK3/2APPROVED – MASTER DATA UPDATEG2 - MASTER DATA UPDATE BEFORE MASS BUILD
0109TANK, SPHERICAL, PRESSUREPressure Sphere / Pressure VesselGMS PRESSURE VESSEL - SPHERE51STR-0109ST-SPHERE2/2APPROVED – MASTER DATA UPDATEG2 - MASTER DATA UPDATE BEFORE MASS BUILD
0111TANK, SILO/HOPPERSilo / HopperGMS SILO / HOPPER35STR-0111ST-TANK3/2APPROVED – MASTER DATA UPDATEG2 - MASTER DATA UPDATE BEFORE MASS BUILD
0112TANK, FXD RF W/FLOAT.RF,ATMStorage TankGMS TANK40STR-0112ST-TANK3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0199TANK, MISCELLENEOUSStorage TankGMS TANK185STR-0199ST-TANK3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0201HEAT EXCH., FIXED TUBEHeat ExchangerGMS HEAT EXCHANGER721STR-0201ST-HX3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0202HEAT EXCH., FLOATING HEADHeat ExchangerGMS HEAT EXCHANGER1.593STR-0202ST-HX3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0203HEAT EXCH., "U" TUBEHeat ExchangerGMS HEAT EXCHANGER757STR-0203ST-HX3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0204HEAT EXCH., SPIRAL & COIL TYPEHeat ExchangerGMS HEAT EXCHANGER252STR-0204ST-HX3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0205HEAT EXCH., COOLING TOWERCooling TowerGMS COOLING TOWER62STR-0205ST-COOLING3/2APPROVED – MASTER DATA UPDATEG2 - MASTER DATA UPDATE BEFORE MASS BUILD
0206HEAT EXCH., PLATE TYPEHeat ExchangerGMS HEAT EXCHANGER16STR-0206ST-HX3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0207HEAT EXCH., FIN TYPEAir-Cooled Heat Exchanger (ACHE)GMS AIR-COOLED HEAT EXCHANGER1.104STR-0207ST-ACHE2/2APPROVED – MASTER DATA UPDATEG2 - MASTER DATA UPDATE BEFORE MASS BUILD
0208HEAT EXCH., BOX TYPEHeat ExchangerGMS HEAT EXCHANGER79STR-0208ST-HX3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0209HEAT EXCH., DOUBLE PIPE TYPEHeat ExchangerGMS HEAT EXCHANGER74STR-0209ST-HX3/2APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0299HEAT EXCH., MISCELLENEOUSHeat ExchangerGMS HEAT EXCHANGER443STR-0299ST-HX3/2APPROVED WITH DATA-QUALITY ACTIONG1 - DATA QUALITY ACTION
0301COLUMN, FRACTIONATORProcess ColumnGMS COLUMN87STR-0301ST-COLUMN3/1APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0302COLUMN, DRIER NON CATALYTICProcess ColumnGMS COLUMN16STR-0302ST-COLUMN3/1APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
0303COLUMN, STRIPPERProcess ColumnGMS COLUMN160STR-0303ST-COLUMN3/1APPROVEDG3 - READY FOR TASK / PLAN ENGINEERING
Halaman 1 / 19